A garage conversion is almost always the least expensive way to add an accessory dwelling unit in New Hampshire. A full ADU build here typically runs $275,000 to $400,000+ depending on design, and a garage conversion sits at the budget end of that spectrum — because the most expensive parts of any build, the foundation, framing, and roof, already exist.
Exactly where your project lands inside that range depends on a short list of variables: how your garage was built, how far it sits from your water, sewer, and electrical lines, and whether your lot is on town sewer or a private septic system. This guide walks through each one, plus the 2025 state law that made garage-conversion ADUs legal by right in every New Hampshire town.
When you build a detached ADU from scratch, you pay for everything: excavation, a foundation pour, framing, sheathing, a roof, and all the site work that comes with a new structure. A garage conversion skips most of that list.
What you're really paying for in a conversion is the gap between "a box that stores cars" and "a dwelling a person can legally and comfortably live in through a New Hampshire winter." That gap is where every dollar goes.
Two garages that look identical from the street can produce very different budgets. These are the line items that separate the low end from the high end:
Yes, in every town. Under RSA 674:72 (amended by House Bill 577, 2025 Chapter 197), effective July 1, 2025, one ADU — attached or detached — is allowed by right wherever single-family homes are permitted. No special exception, no variance, no conditional-use permit for the ADU itself. You pull a normal building permit and meet reasonable local standards: setbacks, lot coverage, septic capacity, building and fire code.
The law is unusually friendly to garage conversions specifically:
The full statewide breakdown is in our NH ADU law guide.
A second dwelling has to be supported by the lot's wastewater capacity. If you're on town sewer, this is usually a straightforward connection question. If you're on a private septic system — as much of New Hampshire is — the added bedroom(s) may require a capacity evaluation, and if the existing system can't support the extra load, a septic upgrade can become the single largest line item in the entire project. Get a septic evaluation before you design anything. It's the one variable that can move a garage conversion from the budget end of the spectrum toward the middle of it.
Run it against the alternatives. A new-build detached ADU is a $300k-class project. A garage conversion targets the same outcome — an independent dwelling on land you already own — for the low end of the range, because you're not buying a structure, you're upgrading one.
Then look at what the unit replaces. If the plan is housing a parent, assisted living in New Hampshire commonly runs $70,000–$100,000+ per year, per commonly cited industry surveys. Against that recurring cost, a one-time conversion that keeps family on your property pays for itself quickly. If the plan is rental income, a legal, permitted ADU in a state with tight housing supply is a durable asset — and unlike a bigger house, it produces income.
Most projects at this scale are equity-financed. The common routes:
Which one wins depends on your current mortgage rate and equity position. Talk to a local lender who knows ADUs — the ones who've financed them before will know how to count the future unit in your favor.
It shouldn't, but many posted ordinances haven't caught up to the 2025 law. Two examples from our Hillsborough County reviews: Amherst's posted ordinance still routes any detached ADU — converting a detached garage included — through a discretionary Planning Board hearing, and Hollis's still says a detached ADU, converted garage or new build, needs a lot twice the district minimum, four acres in some districts. State law overrides both, but a homeowner reading the town PDF would never know it. Before you budget a dollar, check your town's page in our town guides to see which local rules stand and which are superseded.
The cheapest ADU you'll ever build is the one whose walls are already standing — go find out what your garage is worth.
Get a free plain-English ADU report for your town and property — reconciled with the 2025 state law.
Get My Free ADU Report →